Led a business-continuity rollout of battery backup across every office desk and every remote employee's internet connection.
1 per deskCyberPower UPS in the office
89.6 WhLiFePO4 station per remote employee
5fire-code-compliant install options
Business impact
Keeps office workstations, the network edge and every remote employee's internet connection running through power interruptions, with a fire-code-reviewed installation standard.
Problem
Power interruptions took down office workstations and network equipment, and remote staff lost connectivity during outages.
Solution
Standardized battery backup: a CyberPower CP1500PFCLCD UPS at each office desk, a UPS on the office modem/router, and a Daran 89.6 Wh LiFePO4 portable power station for each remote employee's modem and router.
Results & highlights
- Deployed one CyberPower CP1500PFCLCD UPS per office desk for workstation continuity
- Protected the office network edge with a dedicated modem/router UPS
- Equipped every remote employee with a Daran 89.6 Wh LiFePO4 power station (100 W), sourced with spares at a volume discount (September 2026)
- Extended the life of legacy units by sourcing exact replacement batteries
- Ran a fire-code compliance review (NFPA 1, Florida Fire Prevention Code, UL guidance) and defined five compliant installation options
Competencies demonstrated
- Business continuity planning: One UPS per office desk, plus a dedicated UPS for the office modem and router.
- Remote workforce enablement: A LiFePO4 power station for each remote employee's modem and router.
- Procurement: Sourced with spares at a volume discount; exact replacement batteries extended the life of legacy units.
- Compliance review: Reviewed NFPA 1, the Florida Fire Prevention Code and UL guidance, and defined five compliant installation options.